RPL Inventory Upgrades Installation - PNNL

The work consists of supplying labor, materials and subcontracts necessary to modify RPL room 50 to facilitate storage of accountable radiological materials per drawings and specifications. Provide the work as shown on the drawings and specifications including but not limited to jib cranes, purge system, Room 50 upgrades, sprinkler system modification, and installation of 6 (six) Battelle furnished Floor Storage Containers(FSC). Contractor will also be responsible to offload the FSC’s from the manufacturer’s transport truck and to submit a Material Handling Plan for the offload and transport through the facility. Additionally, the contractor shall submit an Installation plan for the handling, hoisting and rigging and installation of the FSC’s inside room 50.

Status

Accepting Bids

Bid Date10/24/18 2:00 pm

Company & Contacts

Fowler General Construction

Brandon Chavez, brandonc@fowlergc.com   509-375-3331

Location

Richland, Eastern WA

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.