Public Jobs

Bidding Closed
2/13/20 4:00 pm
Mt. Adams K-8 School Replacement (Sub-Bids To Fowler General Construction) - Harrah
Fowler General Construction
Harrah, WA
Work includes demolition of existing site elements, new site work, paving (hard surface) revisions, and new building construction. The overall existing building area is approximately 103,000 square feet of new addition+ site work. 2. Construction elements include conventional reinforced cast-in-place concrete foundations, floor slabs, and wood and masonry construction. Site work elements are required to accommodate the new building construction work. 3. Exterior doors are Hollow Metal door/frame assemblies. Exterior glazing systems include aluminum windows and aluminum store front wall door/window systems. Exterior glazing is low-e tempered glass with solar bonze tint. 4. Interior building construction elements include gypsum board attached to wood or wood framing. Interior doors are solid core wood doors in hollow metal frames. 5. Interior finishes include painted walls and other surfaces, polished concrete, carpeting, walk-off carpeting, resilient flooring, ceramic tile walls, ceramic mosaic tile floors, gypsum boards soffits, and suspended acoustical ceilings. 6. Specialties, equipment and furnishings include marker boards, toilet accessories, cabinets and accessories, signs and miscellaneous specialties. 7. Mechanical work includes plumbing systems and fixtures, heating and air conditioning systems. Site mechanical work includes service piping and lines for water and sanitary sewer and fire sprinkler system. 8. Electrical work includes distribution systems, lighting fixtures, fire alarm work, data/phone work. 9. Site work includes plumbing storm drainage systems, water system, earthwork for new improvements, concrete walkways asphalt paving and landscape, irrigation work and fencing, accessories and the like.
Bidding Closed
7/16/19 4:00 pm
Stevens Middle School (Sub-Bids - Fowler General Construction)
Fowler General Construction
Pasco, WA
The Project consists of a new two story Middle School including associated site work and existing building demolition.
Bidding Closed
5/16/19 3:00 pm
Kennewick High School Sub-Bids - Fowler General Construction)
Fowler General Construction
Kennewick, WA
The Project consists of the alteration of an existing Gymnasium and Performing Arts Center and the construction of a new high school.
Bidding Closed
5/7/19 3:00 pm
Columbia River Elementary School (Sub-Bids - Fowler General Construction)
Fowler General Construction
Pasco, WA
A new 2 story building consisting of approximately 74,000 square feet, including Site Work, Structures, Finishes, Fire Protection, Mechanical, and Electrical work.
Bidding Closed
4/18/19 3:00 pm
Tapteal Elementary School (Sub-Bids - Fowler General Construction)
Fowler General Construction
West Richland, WA
A new 2 story building consisting of 65,500 square feet, including Abatement, Demolition, Site Work, Structures, Finishes, Fire Protection, Mechanical, and Electrical work.
Bidding Closed
4/2/19 3:00 pm
Lince Elementary School (Sub-Bids - Fowler General Construction)
Fowler General Construction
Selah, WA
New construction of a kindergarten school building, and sitework related thereto. This Work will take place on an existing site currently in use and occupied by the Owner as a pre-school, school district administration offices, and maintenance & operations shops.